Mackenzie PreK to 8 School

Building: New Construction

Location: 9275 Wyoming Avenue

Project Cost: $21.8 million

Design Builder: MIG / Auch, 50% Detroit-headquartered firm

Architect: SHW Group

Construction Started: Fall 2010

School Open: Spring 2012

School Highlights

The new $21.8 million Mackenzie PreK to 8 School will open in spring 2012 adjacent to the existing Mackenzie High School. The new school will include a large, open media center, gymnasium and classrooms serving the needs of the school’s middle and elementary students. The building design will focus on student safety and will be environmentally-responsible through the adherence to national standards set by CPTED (Crime Prevention Through Environmental Design) and LEED (Leadership in Energy and Environmental Design). The minimum goal is set at a Silver LEED Certification.

 Click here for a downloandable PDF of this page.